This article will introduce the whole process of factory production of Roller Screen Door. I believe that after reading this article, you will have a better understanding of Screen Door, and you can try to produce and install Screen Door by yourself
Thread the magnetic strip into the prepared profile
Pull the rod to install the mute rubber strip
Install fur strip
Install mesh box base and profile fixing Angle
Assembly shaft
Measure the lock position and place the retaining gasket
interposition Lock strip
Fixed lock core
Test lock core

Profile cutting Angle
Cut the required drawstring
The pull rope passes into the pull rod and the fixed Angle
Thread the drawstring into the drawstring buckle
Secure corner code and wire buckle, assemble frame
Adjust drawstring
Attach double-sided tape to the prepared mesh
Temporarily fix the storm strip to the mesh
Sewing wind strips and mesh

The mesh is inserted into the round tube
Thread the mesh into the tie rod
Fixed mesh
The round tube is loaded into the mesh box, and the rotating shaft is inserted into the round tube and fixed
Adjust shaft

Test shaft tension
Place the yarn box into the frame and adjust the drawstring again
Cover with plastic strip

Complete installation
If you are interested in window screens or screen doors, please contact us